On the bridge during ramming

While it sounds rough, pile driving in the pack ice is actually a delicate choreography performed by all personnel on the bridge. Once Chief Mate Igor Pridannikov (left) makes the strategic decisions about direction, pile driving angle and speed, Third Mate Andrei Sidelnikov (center) and Second Engineer Maxim Gora (right) carry out the orders with the rest of the crew.

2020